FAQs

  • Yes. Any new structure, including sheds, decks, and garages, requires a Zoning Permit. Larger structures may also need a Building Permit.

  • Work without a permit is a violation and may result in double fees and possible stop-work orders.

  • Most permits are reviewed within 3–5 business days but could take a month or more to be approved. Please allow adequate time to process your application before your project is scheduled to begin.

  • Most permits are valid for 12 months. Extensions may be requested before expiration.

  • The Zoning Administrator reviews zoning compliance. Some projects may require review by the Planning Commission or Council.

  • A Zoning Permit checks compliance with land use and setbacks. A Building Permit ensures construction meets safety codes.

  • A CUP allows certain land uses that are not automatically permitted in a zoning district, subject to review and approval.

  • Rezoning changes the zoning classification of your property to allow different uses than currently permitted.

  • A variance provides relief from strict zoning standards (like setbacks) when unique property conditions make compliance difficult.

  • Yes. A Zoning Permit is required, and fences must meet height and placement rules.

  • Yes. A Sign Permit is required for most business signs, including illuminated and digital signs. Temporary signs may be exempt.

  • Flags, certain window displays, small temporary real estate signs, and religious symbols.

  • A Certified Survey Map (CSM) is required when splitting, combining, or adjusting lot lines.

  • Yes. All land divisions within the City or Extraterritorial Zoning area must be reviewed.

  • Yes. A Demolition (Raze) Permit is required from both Zoning and Building for removing any structure.

  • Yes. Proof of disconnection from gas, electric, water, and sewer services must be provided before demolition approval.

  • The Building Inspector conducts building code inspections, while the Zoning Administrator checks for zoning compliance.

  • You’ll be notified of deficiencies and given a timeline to correct them before re-inspection.

  • Yes. Variance and zoning decisions can be appealed to the Board of Zoning Appeals.